Series stub — full post TBD. This page exists so the series shape is reviewable.
Planned focus: The whole series in one argument — supply and scheduling aren’t two problems, and the seam between them is the leverage.
Part of “Inside AI Infrastructure: The Compute Layer.” Opinions are my own; public, documented concepts only.